The company has rented a land situated in an excellent area for development of photovoltaic power stations, area which fulfills all the climate and weather conditions for such a Project. The land has access to the most important roads in the area, national roads and an European road.The surface of the land is of 12 ha and it has an authenticated lease contract for land, the superficies right being registred in the Land Registry with an annual rent of 500euro/ha.
The simulation for such a project has already been accomplished in order for the buyer/investor to see its effectiveness, the feasibility study being in its final stage. The buyer will have access to all necessary documents in due course so that the photovoltaic power station to be built in a short period of time.
Such investment has the additional advantage of revenue increasement through green certificates offered to each manufacturer that will sell renewable energy to the national network at a standard price ( existing proposal is represented by 6 certificates for each MW produced). Photovoltaic power station is designed to have a production of 7.5MW and all the construction certificates have been obtained.
The urbanism certificate, the environmental authorization and other approvals necessary to obtain the construction approvals were issued for the entire project, and also for the entire area.
The project will have the approval of the ATR from the Operator of the Electricity Distribution System for a capacity of 7.5MW.
Investor benefits:
- Rapid return on investment – about six years as business plan made by the owner.
- Reduced operational costs since a photovoltaic park does not need raw materials or fuels, but the maintenance panels have a life expectancy of 15-20 years.
Obtained permits and authorisations:
Obtained permits:
Urban Planning Certificate
Grid connection study
Topographic elevation
When a purchase contract will be signed, all the necessary documentation for obtaining the building permit will be sumitted to the authorities. The building permit will be obtained in maximum 30 days.